2nd Postponement of 1st and 2nd Draft reductions for the Neopanamax locks

PANAMA FLASH! – Panama City –March 11th, 2022

RE: ADV10-2022

Recent precipitation in the Canal watershed in the past few days has allowed the Panama Canal

Authority (ACP) to postpone once again the draft adjustments in the Neopanamax locks announced in

Advisory to Shipping A-08-2022.

Therefore, the maximum authorized transit draft for the Neopanamax locks will remain at 15.24 m (50.0

ft.) until March 23, 2022. Effective March 24, 2022, the maximum authorized draft for vessels transiting

the Neopanamax Locks will be 15.09 m (49.5 feet) TFW.

In addition, effective April 9, 2022, the maximum authorized draft for vessels transiting the Neopanamax

Locks will be 14.94 m (49.0 feet) TFW.

The ACP continues to monitor the level of Gatun Lake in order to announce future draft adjustments in a

timely manner.


Norton Lilly International (Panama) S.A.

Bldg. 3825  – Office 204 Howard – Panama-Pacifico Panama, Rep. of Panama

Tel: (507) 304-4600 Fax: (507) 269-3926

Main email: operations@nortonlilly.com.pa  (24 hours)

Management email:  nortonadm@nortonlilly.com.pa (office hours)

Web: www.nortonlilly.com.pa

Recents

Related Posts

Ship Agent in Panama
What condition will be in effect during the Scheduled Lane Outage at Pedro Miguel Locks?

During the scheduled maintenance from May 9th to May 16th, 2023, the West Lane of Pedro Miguel Locks will be temporarily closed. As a result, Condition 2 will be in effect, as per OP NOTICE TO SHIPPING No. N-7-2023. Applications for reserved transit slots during this period will be accepted starting from May 6th, 2023. Please note that the Just-In-Time (JIT) transit slots for supers will be limited to one per direction, while regular vessels will maintain their one per direction allocation. The daily auction slot for supers will be reduced to one, and the daily auction slot for regulars will be suspended. Neopanamax vessels will not be affected by these changes. Due to the reduced canal capacity, demand for transit slots will likely exceed availability. Please plan accordingly as no supers slots will be offered when the 3rd period opens.

Read More »
Ship Agent in Panama
Panama Canal finds necessary to update maximum draft in the Neopanamax Locks

Despite the ACP’s continuous efforts to minimize draft restrictions by implementing water-saving measures in the transit operation, the level of Gatun Lake has been falling faster than originally predicted. The precipitation in the Canal watershed for the first 11 days of April is approximately 70% below the historical average, and the water supplied by the rivers to the Canal’s watershed is 80% below average.

Read More »
Leading Panama Canal & Port Shipping Agent, Norton Lilly Panama is one click away to being your partner of choice.
We can help you make the right decisions regarding the planification of your operations.

Let's talk!

Book a 20 minutes call with our Panama Commercial Team and ask all your questions.

We are here to help!