ACP Draft adjustment to 14.94m TFW for the Neopanamax locks – February 22nd, 2022
Based on the present and projected level of Gatun Lake for the upcoming weeks, the ACP announces that effective March 22, 2022, the maximum authorized draft allowed for vessels transiting the Neopanamax Locks will be 14.94 m (49.0 feet) TFW.
Gatun Locks (West) Dry Chamber Works- September 10th, 2021
ADV37-2001 – Gatun Locks (West – Dry Chamber Works) Sept 23rd – 24th 2021 (2days) The Panama Canal Authority has announced Gatun Locks (West Side ) dry chamber works scheduled for September 23rd and 24th, 2021. It is anticipated that the number of vessels to be scheduled in condition no. 2 will be 18/20 vessels. […]