Additional Information Regarding the Disruption Charge for Harbor Movements
the disruption charge to vessels in harbor movements that present deficiencies or conditions while navigating in the channel of the Canal, effective July 1, 2023.
Draft Adjustment in the Neopanamax Locks postpone
Recent rains in the Panama Canal watershed allow postponement of Panama Canal draft adjustments
Draft Adjustment in the Neopanamax Locks on May 24th
Based on the present and projected level of Gatun Lake for the upcoming weeks, the Panama Canal Authority (ACP) announces Draft Adjustment in the Neopanamax Locks effective May 24, 2023
Panamax locks maintenance: tentative lane outage
Norton Lilly Ship Agent in Panama about Panamax Locks maintenance and tentative lane outage
Panama Canal finds necessary to update maximum draft in the Neopanamax Locks
Despite the ACP’s continuous efforts to minimize draft restrictions by implementing water-saving measures in the transit operation, the level of Gatun Lake has been falling faster than originally predicted. The precipitation in the Canal watershed for the first 11 days of April is approximately 70% below the historical average, and the water supplied by the rivers to the Canal’s watershed is 80% below average.
Panama Canal tentative Panamax locks lane outage maintenance
Canal Authority informs of a tentative lane outage to facilitate maintenance
Draft Adjustment to 14.32 m (47.0 feet) TFW in the Neopanamax Locks
Draft Adjustment to 14.32 m (47.0 feet) TFW in the Neopanamax Locks
Draft Adjustment to 14.48 m (47.5 feet) TFW in the Neopanamax Locks
PANAMA FLASH! Draft Adjustment to 14.48 m (47.5 feet) TFW in the Neopanamax Locks Based on the present and projected level of Gatun Lake for the upcoming weeks, the Panama Canal Authority (ACP) announces that effective April 22, 2023, the maximum authorized draft allowed for vessels transiting the Neopanamax locks will be 14.48 m (47.5 […]
Panama Canal incident in Pacific entrance channel
Full container vessel Cape Kortia reported an outbreak of fire in the Engine room
Update to the Panama Canal customer code procedure
The Panama Canal Authority (ACP) published today the new version of the Customer Code procedure which includes the following changes.